Six problems you know. One answer.

Unplanned stops

CAPMAC names the machine, the likely cause and what to check first, so repair is planned, not rushed.

Wasted energy and steam

See where energy is leaving each unit, and what it costs at your own prices.

Loops fighting each other

Every loop checked and ranked, with the likely cause: tuning, valve or instrument.

Valves misbehaving

Sticking and valve play: a ranked list of the valves to test first.

Quality drift

Readings that disagree are flagged for your instrument team.

Maintenance by the calendar

Condition trends and remaining life, as a range, turn into ranked work-order requests.

What goes in, what comes out

Your records in. Your report out.

No new sensors, no shutdown and nobody on site to start.

You send

  • Records exported from your control system or historian, as CSV or Excel files
  • Exports and trend logs as CSV or Excel, and data reports
  • Process readings: pressures, flows, temperatures, levels, power
  • Vibration, current and dissolved-gas readings, wherever you log them
  • Optionally, your tariff, so findings carry a cost

You get

  • A ranked work list in plain words: machine, likely cause, what to check first
  • The cost of each finding at your tariff
  • Remaining-life estimates as a range, for supported machines
  • PDF and CSV reports in English, Hindi, Marathi and Gujarati
  • Alerts by WhatsApp, SMS or e-mail, and work-order requests
A sample page

A work list your team can act on today.

Each line names the unit, the likely cause and the first check. Each alarm lists the readings behind it.

  • P1 act now
  • P2 plan this month
  • P3 note
Ranked work list Sample page
P1
Loop R018: valve may be stickingLikely cause: packing, stem dirt or actuator wear. Check first: output against valve position.
P2
Chiller CH-1: suspected condenser foulingApproach up from 2 to 3.5 °C at the same load. Check first: approach and water flow at steady load.
P3
Pump P-4: reading frozenThe signal stays flat while the process moves. Check first: transmitter and wiring.
Illustrative sample. Unit names are examples.
Where CAPMAC leads

Built for the machines that run your plant.

A growing library of machines, with checks built for each sector.

Process plants and refineries

Loops, valves, compressors, exchangers and columns. Steadier loops and valves tested in order of need.

Power plants

Boilers, steam and gas turbines, condensers and transformers. Tube leaks and fouling checked from the historian.

Pumps, compressors, fans and motors

Cavitation, dry run, impeller wear, seal leaks, imbalance, belt slip, broken rotor bars.

Chillers and utilities

Chillers, cooling towers, air handlers and cleanrooms for pharma, hospitals, data centres and malls.

Gearboxes and bearings

Tooth wear, misalignment, oil trouble and bearing damage, industrial and marine.

Valves, loops and instruments

Sticking valves, loops that swing or saturate, sensors that drift, freeze or disagree.

Sectors we serve

  • Refineries
  • Chemicals
  • Power
  • Steel
  • Cement
  • Sugar
  • Pharma utilities
  • Marine
  • Dairy
  • Data centres
  • Water utilities
  • Gold and jewellery
Ready today

Ready machines.

Each reads records your plant already keeps and gives a clear answer.

Rotating machines

  • Gearbox: tooth damage and bearing trouble from vibration
  • Rolling bearing: outer and inner race damage from vibration
  • Induction motor: broken rotor bars from motor current
  • Pump cavitation: cavitation from sound or vibration
  • Centrifugal pump: expected power and head from speed, flow and pressure
  • Screw compressor: expected flow, power and discharge temperature
  • Piston compressor: expected delivered flow and power
  • Heat-pump compressor: expected refrigerant flow

Heat and cooling

  • Water chiller: expected evaporator temperature and related readings
  • Cooling tower: expected cold-water temperature from weather, load and fans
  • Gas cooler: expected outlet temperatures

Process and utilities

  • Control loop health: sticking valves, cycling loops and bad data
  • Plant balance and meters: meters reading wrong, balances that do not add up
  • Compressed-air leaks: sudden large air leaks
  • Boiler and turbine: expected pressure, steam flow and load values
  • Water quality events: sudden changes in online readings
  • Tank-fed supply hours: hours of supply from tank and flow records
  • Leak noise correlator: leak position from two pipe sensors
  • Pipe break forecast: expected breaks per year from the pipe register
  • Zone flow leak watch: leaks from district inflow records

150+ more machine models available for pilots, fitted to your plant’s own records.

Proven where it counts

Tested on plant records and our own test plants.

Over-tuned loops found every timeOn our own test plants, built to industry practice, checked across the whole unit, so swinging from tuning is told apart from a sticking valve.
Compressor seal-oil use predictedA refinery compressor's seal-oil use predicted from its own records.
65 real loops screenedNo valve wrongly blamed.
How you start

How you start.

01

Records-based assessment

Send an export. Receive the report and review it together with your engineers.

02

Regular checks

Send a fresh export each month. The checks run again, with a ranked report and what has changed since last time. New settings given in your control system's own terms, for your engineers to enter.

Runs on your premises

CAPMAC can run on your plant's own computer, so your data stays in your plant. No cloud is needed.